PAS 8811:2017 Temporary works
Publicly Available Specifications (PAS) are fast-track standards, specifications, codes of practice or guidelines developed by sponsoring organisations to meet an immediate market need. They set industry-wide standards and are produced collaboratively by key stakeholders. If a majority consensus can be achieved, and if they are endorsed by BSI, then PAS function as if they are British Standards.
PAS 8811:2017 Temporary works – Major infrastructure client procedures – Code of practice was published by BSI in January 2017. It is one of two PAS’s sponsored by HS2 and the Temporary Works Forum and can be used in conjunction with PAS 8812 Temporary works – Application of European Standards in design – Guide, which gives guidance on the application of European standards in the fields of structural and geotechnical temporary works design.
PAS 8811:2017 provides guidance on procedures for temporary works aimed explicitly at major infrastructure clients. It complements, and is intended to be used in conjunction with, BS 5975 Code of practice for temporary works procedures and the permissible stress design of falsework expanding areas where there is limited information provided for major infrastructure projects.
It gives recommendations about procedures for temporary works and temporary conditions of permanent works during construction and covers; processes, roles, responsibilities, competences and documentation.
It establishes a unified approach across all stages of a project and eliminates unnecessary procedures and conflicts to ensure there is clarity and delays are minimised during compliance and approvals and other necessary procedures.
Orgnaisations that contributed to the PAS include; Aecom, Balfour Beatty, Carillion, CH2M, Costain, Crossrail, Groundforce, the Health & Safety Executive, HS2, Highways England, the Institution of Civil Engineers, Kier, London Underground, Morgan Sindall, Mott McDonald, National Access & Scaffolding Confederation (NASC), National Grid, Network Rail, Skanska, Tideway and Tony Gee & Partners.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.